Big Hollow Manhole Seepage Remediation

SUMMARY AND BACKGROUND

Des Moines County Conservation (DMCC) is soliciting proposals from qualified contractors to remediate water seepage occurring at specific manholes within Big Hollow Recreation Area. The purpose of this RFP is to engage contractors capable of sealing the annular space inside the manholes and constructing concrete collars around the exterior of affected manholes as shown in Attachment A. The project includes confined-space work in a sewer environment; therefore, proper entry procedures, permits, and safety protocols must be strictly followed.

PROPOSAL GUIDELINES

PROJECT PURPOSE AND DESCRIPTION

The goal of this project is to seal the space between the concrete manhole and the PVC riser to prevent groundwater infiltration. Additionally, a reinforced concrete collar must be installed on the exterior of each manhole to counteract buoyant forces associated with high groundwater conditions. The attached plan (Attachment A) provides engineering details for these tasks. Contractors are HIGHLY encouraged to visit the site prior to submitting a bid.

Completion during the 2026 construction season is preferred if weather conditions allow; however, the required completion date for the project is April 1, 2027.

PROJECT SCOPE